
iCity — Grade A Business Centre
Electrical and ELV fit-out delivered under a compressed programme with close coordination between architectural, MEP and fit-out teams.
Electrical infrastructure delivered with contractor discipline: structured mobilisation, controlled execution, daily reporting and complete handover documentation.
ExploreElectrical execution is managed as one connected operating system—from engineering and workfront planning to QA/QC, forecasting and client visibility.
Not just installed. Measured, coordinated and controlled.
PREXEN Engineering is a managed electrical subcontractor for business centres, residential developments and hotels. Site execution is supported by a complete engineering and commercial structure, one project-control platform and a single operating standard. Electrical contracting is the launch capability, with ELV expansion planned under the required UAE activities and approvals.
The UAE entity is new. The delivery experience is not. These projects show the electrical, ELV, industrial and site-management capability developed by the founding and operational teams before entering the UAE market.

Electrical and ELV fit-out delivered under a compressed programme with close coordination between architectural, MEP and fit-out teams.

Integrated electrical, ELV, security and utility-metering delivery across a large residential complex.
Representative image
Industrial / Restricted access / Mar 2026 — PresentRestricted Oil & Gas Facility — Electrical Infrastructure
Controlled accessIndustrial electricalCurrent
Large-scale electrical installation for a restricted facility operating under strict safety, quality and documentation requirements. Representative image is used because the project cannot be publicly identified.
Installation, connection and commissioning across warehouse, loading, technical and perimeter areas, requiring rapid mobilisation and coordinated workfront planning.
Representative image
Residential / Nov 2024 — Jun 2025Premium Residential Development with Underground Parking
Multi-zoneUnderground parkingELV
Electrical and ELV installation across residential zones, common areas, underground parking and technical spaces.
Parallel installation across two large warehouse and fulfilment facilities with multiple teams and concurrent work zones.
Representative image
Industrial / Apr 2023 — Nov 2024Oil Refining Facility — Electrical Installation Package
IndustrialEnhanced safetyCommissioning
Electrical installation in demanding industrial conditions with enhanced access, safety and technical-documentation requirements.
Long-term phased delivery for a restricted industrial and oil-processing facility, requiring continuous mobilisation, workforce planning and production control.
Project image
High-rise residential / MoscowShelepikha Residential Complex — Electrical & ELV Installation Package
650+ units80+ km cable2,000+ points
Large high-rise residential package covering apartments, common areas, technical zones and integrated security infrastructure.
Projects shown were delivered in Russia by members of the PREXEN leadership and operational teams before establishment of the UAE entity. Named-project images identify the relevant developments; representative images are clearly used where access or confidentiality restrictions prevent publication. UAE launch scope remains subject to the locally licensed activities and required approvals.
A focused electrical contracting offer designed for general contractors, fit-out companies and developers who need reliable site delivery rather than another layer of coordination.
Installation of LV distribution infrastructure from containment and cabling through final connections, coordinated to approved drawings and project sequencing.
Complete lighting installation for workplaces, residential areas and public zones, including supports, wiring, fixtures, controls and testing.
High-output installation of cable trays, trunking, conduits and support systems with disciplined routing, levels and interface control.
Inspection support, testing records, snag closure and structured as-built documentation prepared for a controlled project handover.
Electrical packages delivered for the building types where programme discipline, interface control and documentation matter most.
We operate as a managed subcontractor—not a labour supplier. Scope, manpower, work fronts, quantities, productivity, quality and close-out are controlled as one production system.
Drawing review, interfaces, quantities, constraints and the first workable delivery sequence.
Team structure, access, tools, materials, daily targets and reporting lines established before production ramps up.
Daily quantities, labour productivity, photo records, coordinated work fronts and immediate escalation of blockers through the project-control platform.
Measured works, change control, testing, inspections, snag closure, as-built records and a handover package aligned with the main contractor’s programme.
Every subcontract package is supported by defined technical, operational and commercial ownership. The objective is simple: fewer coordination gaps, faster decisions and predictable production.
Single point of accountability for programme, interfaces, resources, reporting and client communication.
Technical leadership, engineering decisions, authority coordination and DEWA interface aligned with the applicable project and licensing requirements.
Workfront planning, crew control, daily targets, quality checks and blocker escalation.
Drawing review, RFIs, method statements, technical submissions, redlines and as-built documentation.
BOQ analysis, measured quantities, productivity economics, variations and forecast-to-complete.
Inspection planning, safety coordination, test records, snag management, document status and structured close-out.
PREXEN’s in-house project-control platform tracks installed quantities, labour productivity, forecasts, tasks, blockers and documentation. Main contractors receive a dedicated client portal with live visibility of progress and delivery risk.
Production controlDaily output is converted into measurable quantities, labour productivity and forecast-to-complete—not buried in chat messages and spreadsheets.
Client transparencyThe main contractor sees the same operating picture: completed work, planned work, constraints, documents and accountable owners.
ELV systems will be added after the relevant UAE trade activities, approvals and technical requirements are formally in place.
Send the drawings, BOQ or a short project brief. We will structure the scope, identify delivery constraints and define the next commercial step.
projects@prexengroup.com ↗